Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the change-wp-admin-login domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u168781334/domains/cashmycurrency.com/public_html/wp-includes/functions.php on line 6260
PPL brings Faiz X-1 well on stream after decade | The Express Tribune – Cash My Currency- Financial Updates | Business Blog Post | Financial Guest Posting Services

PPL brings Faiz X-1 well on stream after decade | The Express Tribune

PPL brings Faiz X-1 well on stream after decade | The Express Tribune

KARACHI:

Pakistan Petroleum Limited (PPL) has successfully commissioned Faiz X-1 Deep (Basal Sand) at its operated Gambat South Block in Sanghar, Sindh, according to a statement issued on Saturday.

Production was ramped up in stages since its commissioning on February 25, 2026, currently flowing about 3.6 million standard cubic feet per day (MMscfd) of gas and 750 barrels per day (bpd) of condensate after optimisation of operational parameters.

Drilled in 2014, the Faiz X-1 discovery could not be developed earlier because of the absence of nearby pipeline infrastructure, which made the project uneconomical. After pipeline connectivity, the Basal Sand interval was determined to be commercially viable.

Scroll to Top